Invest In Our Technology

Image by Sarmat Batagov
Image by Ali Kazal
Investment Stage: OPEN
Seeking Lead Investor

Phase 1A: Concept validation - 3D CFD

   $1.5M USD via SAFE

   Valuation cap $20-25M

   Discount 20%

   (also open to a "priced round")

Objective:

   Progress from TRL  2.5 to end of TRL 3

   Duration: ~1 year

---

Phase 1B: Concept validation - Wind Tunnel

   $3.5M USD, Priced Round

Objective:

   Progress to end of TRL 5

   Duration: ~2 years

Phase 2:

   $20M - $35M USD

   Prototype Demonstration

 

Objective:

   Progress to TRL 6/7.

   Duration: ~3 - 4 years

Phase 3: Potential IPO

   Bankability Demonstration

   Funding Required: TBA

 

Objective:

   Progress to TRL 9.

   Duration: ~2 - 4 years

Image by Sébastien Bourguet

Pitch Deck

Please download our Pitch Deck by clicking on the pdf below.

Phase 1 Investment - OBJECTIVES

TRL 3

  • Full 3D CFD validation

  • Aerodynamic optimisation

  • Vortex stability modelling

  • Pressure field validation

  • Load predictions.

 

TRL 4

  • Wind tunnel testing

  • Flow visualisation

  • PIV measurement

  • CFD calibration.​

TRL 5

  • Integrated subsystem prototype

  • Internal turbine prototype

  • Generator integration

  • Small-scale energy production test.

  • Deliverables investors like:

  • Validated power coefficient (Cp)

  • Validated aerodynamic amplification

  • Preliminary LCOE model

  • Preliminary structural loads.​

At TRL 5, the technology moves from theory → validated subsystem.

Phase 2 Investment - OBJECTIVES

TRL 6

  • Build scaled outdoor prototype

  • Structural verification

  • Dynamic wind behaviour

  • Turbine control system.

Scale likely:

1–2 MW prototype (or 30–50% scale machine)

​

TRL 7

  • Build first full-scale turbine

  • Grid-connected

  • Operational testing.​​

Major cost drivers:

  • steel structure fabrication

  • generator system

  • foundation

  • instrumentation

  • construction crane installation.

This stage proves that the machine works in real operating conditions.

Phase 3 Investment - OBJECTIVES

TRL 7 - 9

  • Certification

  • Reliability testing

  • Bankability.

 

Activities:

  • Deploy 3–5 turbines

  • Pilot wind farm

  • Certification with organisations like:

    • DNV

    • TÜV.

This phase proves:

  • Durability

  • Energy production curves

  • Maintenance cost.

  • Full economics and business model​​

Major cost drivers:

  • steel structure fabrication

  • generator system

  • foundation

  • instrumentation

  • construction crane installation.

Ready for IPO and commercialisation.