Investment Stage: OPEN

Phase 1: Seeking

   $4.0M USD in two tranches

($1M initial, $3M milestone-based)

   for 14% equity

Objective:

   Progress from TRL  2.5 to TRL 5.

   Duration: ~2 - 3 years

Phase 2:

   $20M - $35M USD

   Prototype Demonstration

 

Objective:

   Progress from TRL  5 to TRL 6/7.

   Duration: ~3 - 4 years

Phase 3: Potential IPO

   Bankability Demonstration

   Funding Required: TBA

 

Objective:

   Progress from TRL 6/7 to TRL 8.

   Duration: ~2 - 4 years

Invest In Our Technology

Image by Sarmat Batagov
Image by Ali Kazal
Image by Sébastien Bourguet

Pitch Deck

Please download our Pitch Deck by clicking on the pdf below.

Phase 1 Investment - OBJECTIVES

TRL 3

  • Full 3D CFD validation

  • Aerodynamic optimisation

  • Vortex stability modelling

  • Pressure field validation

  • Load predictions.

 

TRL 4

  • Wind tunnel testing

  • Flow visualisation

  • PIV measurement

  • CFD calibration.​

TRL 5

  • Integrated subsystem prototype

  • Internal turbine prototype

  • Generator integration

  • Small-scale energy production test.

  • Deliverables investors like:

  • Validated power coefficient (Cp)

  • Validated aerodynamic amplification

  • Preliminary LCOE model

  • Preliminary structural loads.​

At TRL 5, the technology moves from theory → validated subsystem.

Phase 2 Investment - OBJECTIVES

TRL 6

  • Build scaled outdoor prototype

  • Structural verification

  • Dynamic wind behaviour

  • Turbine control system.

Scale likely:

1–2 MW prototype (or 30–50% scale machine)

​

TRL 7

  • Build first full-scale turbine

  • Grid-connected

  • Operational testing.​​

Major cost drivers:

  • steel structure fabrication

  • generator system

  • foundation

  • instrumentation

  • construction crane installation.

This stage proves that the machine works in real operating conditions.

Phase 3 Investment - OBJECTIVES

TRL 7 & 8

  • Certification

  • Reliability testing

  • Bankability.

 

Activities:

  • Deploy 3–5 turbines

  • Pilot wind farm

  • Certification with organisations like:

    • DNV

    • TÜV.

This phase proves:

  • Durability

  • Energy production curves

  • Maintenance cost.

  • Full economics and business model​​

Major cost drivers:

  • steel structure fabrication

  • generator system

  • foundation

  • instrumentation

  • construction crane installation.

Ready for IPO and commercialisation.