Investment Stage: OPEN
Phase 1: Seeking
$4.0M USD in two tranches
($1M initial, $3M milestone-based)
for 14% equity
Objective:
Progress from TRL 2.5 to TRL 5.
Duration: ~2 - 3 years
Phase 2:
$20M - $35M USD
Prototype Demonstration
Objective:
Progress from TRL 5 to TRL 6/7.
Duration: ~3 - 4 years
Phase 3: Potential IPO
Bankability Demonstration
Funding Required: TBA
Objective:
Progress from TRL 6/7 to TRL 8.
Duration: ~2 - 4 years
Invest In Our Technology



Pitch Deck
Please download our Pitch Deck by clicking on the pdf below.
Phase 1 Investment - OBJECTIVES
TRL 3
-
Full 3D CFD validation
-
Aerodynamic optimisation
-
Vortex stability modelling
-
Pressure field validation
-
Load predictions.
TRL 4
-
Wind tunnel testing
-
Flow visualisation
-
PIV measurement
-
CFD calibration.​
TRL 5
-
Integrated subsystem prototype
-
Internal turbine prototype
-
Generator integration
-
Small-scale energy production test.
-
Deliverables investors like:
-
Validated power coefficient (Cp)
-
Validated aerodynamic amplification
-
Preliminary LCOE model
-
Preliminary structural loads.​
At TRL 5, the technology moves from theory → validated subsystem.
Phase 2 Investment - OBJECTIVES
TRL 6
-
Build scaled outdoor prototype
-
Structural verification
-
Dynamic wind behaviour
-
Turbine control system.
Scale likely:
1–2 MW prototype (or 30–50% scale machine)
​
TRL 7
-
Build first full-scale turbine
-
Grid-connected
-
Operational testing.​​
Major cost drivers:
-
steel structure fabrication
-
generator system
-
foundation
-
instrumentation
-
construction crane installation.
This stage proves that the machine works in real operating conditions.
Phase 3 Investment - OBJECTIVES
TRL 7 & 8
-
Certification
-
Reliability testing
-
Bankability.
Activities:
-
Deploy 3–5 turbines
-
Pilot wind farm
-
Certification with organisations like:
-
DNV
-
TÜV.
-
This phase proves:
-
Durability
-
Energy production curves
-
Maintenance cost.
-
Full economics and business model​​
Major cost drivers:
-
steel structure fabrication
-
generator system
-
foundation
-
instrumentation
-
construction crane installation.
Ready for IPO and commercialisation.